Startchancen schools
Start the project

FUNDING VIA PILLAR I – STEP BY STEP

The Startchancen programme is implemented by the federal states, so every state has its own guideline. The basic logic, however, is similar everywhere.

FUNDING VIA PILLAR I – STEP BY STEP
Quick Answer

Pillar I funds investments in a modern learning environment at Startchancen schools. The school authority applies, usually to a state funding bank or authority, and contributes its own share. The school provides the pedagogical justification. Funding rates, minimum project sizes and deadlines differ by state – e.g. up to 70% in Saxony and Baden-Württemberg, up to 80% in Saxony-Anhalt, according to the respective guidelines.

Who does what

  • School: describes the need and pedagogical benefit (short concept), involves the school conference
  • School authority: plans, obtains quotes, applies for funding, contributes its own share, procures
  • State authority / funding bank: reviews and approves, pays out the grant
  • Supplier (us): documentation, standards documentation (DIN EN 16630), firm quote, delivery and installation

Typical documents

  • Short pedagogical concept
  • Cost estimate or quote
  • Site plan / description of the outdoor area
  • Proof of standard compliance (DIN EN 16630)
  • Financing plan including own share

Typical exclusions

  • Pure maintenance or preservation without pedagogical added value
  • Double funding from other federal, EU or state programmes (rules vary)
  • Measures below the state’s minimum project size (e.g. €35,000 grant in Saxony, €14,286 in Baden-Württemberg)
  • Running operating costs

Tip: combine measures

Where a state has a high minimum project size, a single station may be too small on its own. It can then be part of a broader schoolyard measure – e.g. together with shade, seating, greening or accessible paths.

All 16 federal states at a glance

StateFunding rate (per guideline)Official information
Baden-Württembergup to 70% · L-BankOpen
Bavariaup to 70% (up to 90% for financially weak authorities)Open
Berlineligible costs covered in full (max. 70% federal, min. 30% state) · SenBJFOpen
Brandenburg–Open
Bremen–Check with the state ministry of education
Hamburg–Check with the state ministry of education
Hesse–Check with the state ministry of education
Mecklenburg-Western Pomerania–Check with the state ministry of education
Lower Saxonyup to 70% · RLSB LüneburgOpen
North Rhine-Westphalia–Check with the state ministry of education
Rhineland-Palatinate–Open
Saarland–Check with the state ministry of education
Saxonyup to 70% · SABOpen
Saxony-Anhaltup to 80% · Investitionsbank Sachsen-AnhaltOpen
Schleswig-Holstein–Check with the state ministry of education
Thuringia–Check with the state ministry of education

Last checked: October 2026. Information based on the official sources linked above. Rates and deadlines may change — the respective state guideline is always authoritative. We do not promise any funding.

Share this page with your school authority or staff

Frequently asked questions

How high is the funding rate?

It depends on the state. According to the guidelines: up to 70% in Saxony and Baden-Württemberg, up to 70% in Bavaria (up to 90% for financially weak authorities), up to 80% in Saxony-Anhalt. Always check the current official source.

Can the school apply itself?

No, Pillar I applications are submitted by the school authority.

Is there a deadline?

Deadlines are set by each state. In Saxony, for example, the short concept had to be submitted to the LaSuB by 31 December 2026 and the application to the SAB by 30 June 2027.

Sources

Last checked: October 2026

Planning a project at your school?

Tell us about your school in the Park Finder or contact us — we provide documentation and a firm quote for the application.